Powered by Made-in-China.com
Heavy-Duty Compact Pile Driver Sv-300 for Limited Access Areas
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Design: Unique side grip enables piling in tight spaces like tunnels and under bridges.
360-Degree Rotation: Full rotation allows precise positioning from any angle without moving the excavator.
Dual Clamping System: Side and bottom clamps work together to securely grip piles during driving and extraction.
Versatile Pile Compatibility: Handles steel sheet piles, H-beams, and pipe piles with quick changeovers.
Complete Piling Cycle: Performs clamping, positioning, driving, and extraction without auxiliary equipment.
ISO 9001:2015 Certified: Manufactured with high-strength materials ensuring durability and minimal maintenance.
Global Technical Support: 24/7 assistance and spare parts supply available worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Compact Pile Driver for Efficient Spiral Foundations
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Compact Pile Driver for Confined Job Sites
US$300,000.00
1 Set(MOQ)
Powerful Side Grip Pile Driver for Heavy Duty Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with CE Certification for Global Construction
US$120,000.00
1 Set(MOQ)
Heavy-Duty Silent Pile Driver for Efficient Construction Tasks
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Dual Clamping Side Grip Pile Driver for Excavators
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Eccentric Hammer Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty SDLQ LG-4 Solar Pile Driver for Efficient Ground Installation
US$22,000.00-26,000.00
1 Piece(MOQ)
High-Efficiency Low Clearance Pile Driver for Heavy-Duty Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Vibro Driver for Multiple Pile Applications
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Excavation Pile Driver for Ultimate Groundwork Efficiency
US$34,500.00-35,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Ground Screw Pile Driver for Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)
Durable SDLQ LQ180-18 Wheeled Pile Driver for Heavy Duty Use
US$30,000.00-36,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Vibro Pile Driver for Construction Projects
US$7,000.00-9,000.00
1 pieces(MOQ)
10m Heavy Duty Photovoltaic Pile Driver for Large Solar Farm Construction
US$26,999.00-27,590.00
1 Set(MOQ)
Compact Flexible Crawler Solar Pile Driver Machine for Limited Narrow Construction Site
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Static Pile Driver for Solar Panel Setup
US$9,800.00-25,000.00
1 Piece(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
Heavy-Duty 40 Ton Hydraulic Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
High-Efficiency Diesel Hammer Pile Driver for Heavy-Duty Construction Needs
US$36,000.00-66,000.00
1 Piece(MOQ)



















