Powered by Made-in-China.com
Heavy-Duty Dual Clamping Pile Driver Tool with 2300 Rpm
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps secure piles, eliminating need for extra handling equipment.
360-Degree Rotation: Enables precise pile positioning from any angle, boosting operational efficiency.
Low Clearance Capability: Designed for limited headroom piling in factories, under bridges, and tunnels.
Versatile Pile Compatibility: Adapts quickly to steel sheets, H-beams, and pipes using standard clamp seat.
Self-Sufficient Operation: Handles clamping, positioning, driving, and extraction without cranes or support.
ISO 9001:2015 Certified: Compliant with international quality standards ensuring high durability.
Customization Options: Color and logo application available to match specific fleet requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for key regions.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliant. High-strength materials ensure durability.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Dual Clamping Pile Driver with Ergonomic Side Grip
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Efficiency Low Clearance Pile Driver for Heavy-Duty Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Versatile Top Press and Clamp
US$300,000.00
1 Set(MOQ)
Heavy-Duty Sv-300 Side Grip Pile Driver with 360° Rotation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Eccentric Pile Driver with Smart Control Technology
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Post Driver Tool with Comfortable Ergonomic Handle
US$3.99-5.99
350 Sets(MOQ)
Heavy-Duty Crane-Mounted Pile Driver with 8 Ton Capacity
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with High Vibration Speed
US$13,500.00-14,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Innovative Jaw Technology
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Excavator Vibro Pile Driver with Robust Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Sheet Pile Driver with Powerful Vibro Hammer
US$14,000.00-14,500.00
1 Piece(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Advanced Vibro Hammer Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
35 Ton Heavy-Duty Hydraulic Vibro Pile Driver Hammer for Efficient Piling
US$16,100.00
1 Piece(MOQ)
Goodeng GPY228 Hydraulic Static Pile Driver Heavy-Duty Pile Driving Construction Equipment
US$150,000.00-250,000.00
1 Piece(MOQ)
Professional Hydraulic Vibro Pile Driver for Heavy Duty Excavator Mounted Operations
US$11,040.00
1 Piece(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with Efficient Hydraulic Clamp System
US$12,600.00-19,500.00
1 Piece(MOQ)
Heavy Duty Photovoltaic Pile Driver Hard Ground Drilling
US$40,000.00
1 Piece(MOQ)



















