Powered by Made-in-China.com
Heavy-Duty Hydraulic Pile Driver with 3200 Rpm Power
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-350SPressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
134.4kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
3200 RpmCentrifugal Force
505 kNEccentric Moment
7.4 KgmOperation Pressure
32 MPaWork Flow
240~320 L/MinMax.Pile Length
12mSuitable Excavator
36~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
High Vibration Power: Delivers 505 kN centrifugal force, surpassing traditional drivers for same-tonnage excavators.
Solar Farm Specialization: Tailored for photovoltaic industry with efficient driving of piles in large-scale solar projects.
Compact Lightweight Design: Ultra-compact and lightweight structure allows flexible operation in tight construction spaces.
Global Component Quality: Powered by global hydraulic motors and German bearings for reliability and long service life.
Cost-Effective Operation: Optimized fuel and equipment usage reduce machinery investment and daily operational costs.
Proven Field Performance: Tested in diverse soil conditions including photovoltaic projects for stable and reliable quality.
ISO 9001:2015 Certified: Manufacturing adheres to strict ISO 9001:2015 standards ensuring high-quality production.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty 360° Rotating Pile Driver for Bridge Construction Efficiency
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Sv-400 Side Grip Pile Driver for Industrial Use
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Static Pile Driver with CE Certification
US$300,000.00
1 Set(MOQ)
Heavy-Duty Pile Driver with High Vibration Efficiency Features
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Pile Driver with Advanced Vibration Control Technology
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Counterweight for Enhanced Stability
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with High Vibration Speed
US$13,500.00-14,000.00
1 Piece(MOQ)
Professional Hydraulic Vibro Pile Driver for Heavy Duty Excavator Mounted Operations
US$11,040.00
1 Piece(MOQ)
Heavy-Duty Jzl120 Pile Driver with Hydraulic Power
US$175,000.00-180,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Enhanced Capacity Design
US$150,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 120t Power Capacity
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Advanced Vibro Hammer Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Driver for Multiple Pile Applications
US$22,000.00-23,000.00
1 Piece(MOQ)
Good Quality Heavy Duty Portable Hydraulic Pile Driver
US$800.00-1,888.00
1 Set(MOQ)
Heavy-Duty Hydraulic Sheet Pile Driver with Powerful Vibro Hammer
US$14,000.00-14,500.00
1 Piece(MOQ)
35 Ton Heavy-Duty Hydraulic Vibro Pile Driver Hammer for Efficient Piling
US$16,100.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Ground Screw Pile Driver for Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)
SDLQ LQR-120 Heavy-Duty Track System Rotary Drilling Rig hydraulic screw pile driver
US$70,000.00-80,000.00
1 Piece(MOQ)
Heavy Duty Photovoltaic Pile Driver Hard Ground Drilling
US$40,000.00
1 Piece(MOQ)



















