Powered by Made-in-China.com
Heavy-Duty Hydraulic Pile Driver with 360° Grip Rotation
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-150Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
82.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
3.1 KgmCentrifugal Force
310 kNVibration Frequency
2300~3000 RpmSide Clamp Force
335kNBottom Clamp Force
385kNOperation Pressure
32 MPaWork Flow
130~180 L/MinWeight
1950 KgSuitable Excavator
20~25 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Unique side grip design allows operation in spaces with minimal vertical clearance.
Dual Clamping System: Side and bottom clamps work together to securely grip piles during driving and extraction.
Versatile Pile Compatibility: Accommodates sheet piles, H-beams, and pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without auxiliary equipment.
ISO 9001:2015 Certified: High-strength materials and durable frame ensure minimal maintenance and quality.
Customizable Options: Color scheme and logo application can be customized to match your fleet.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Hydraulic Side Grip Pile Driver Sv-200 for Sheet Pile & H-Beam 360° Rotation Low Noise Piling Equipment
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Dual Clamping Hydraulic Pile Driver for Excavators
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Crane-Mounted Pile Driver with 8 Ton Capacity
US$300,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Adjustable Arm Extension
US$300,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Effective Piling Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Jzl120 Pile Driver with Hydraulic Power
US$175,000.00-180,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Vibro Pile Driver with Robust Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Juxiang Hydraulic Pile Driver for Construction Efficiency
US$34,500.00-35,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$300,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Extended Arm Technology
US$120,000.00
1 Set(MOQ)
Heavy Duty 30 Ton Excvator Hydraulic Tilt Pile Driver for Construction Projects
US$14,500.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with High Vibration Speed
US$13,500.00-14,000.00
1 Piece(MOQ)
35 Ton Heavy-Duty Hydraulic Vibro Pile Driver Hammer for Efficient Piling
US$16,100.00
1 Piece(MOQ)
Durable 360° Hydraulic Pile Driver for Heavy-Duty Excavators
US$22,000.00-23,000.00
1 Piece(MOQ)
Good Quality Heavy Duty Portable Hydraulic Pile Driver
US$800.00-1,888.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for 28/30t Weight Capacity and Drilling Depths of 30m
US$50,000.00-55,000.00
1 Set(MOQ)
Professional Hydraulic Vibro Pile Driver for Heavy Duty Excavator Mounted Operations
US$11,040.00
1 Piece(MOQ)
Hydraulic Tilt Pile Driver with 360 Degree Rotation for 25 Ton Excavator
US$13,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with Efficient Hydraulic Clamp System
US$12,600.00-19,500.00
1 Piece(MOQ)



















