Powered by Made-in-China.com
Heavy-Duty Vibro Hammer for Fast Foundation Piling Solutions
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Enables precise pile positioning from any angle for enhanced efficiency.
Low Clearance Capability: Unique side grip design allows operation in limited headroom areas.
Dual Clamping System: Side and bottom clamps securely hold piles without extra handling.
Versatile Pile Compatibility: Fits steel sheets, H-beams, and circular pipes with quick changeovers.
Self-Sufficient Operation: Completes clamping, driving, and extraction without auxiliary equipment.
ISO 9001:2015 Certified: Ensures high-quality manufacturing and durable low-maintenance materials.
Customizable Color and Logo: Machine can be customized to match fleet branding and preferences.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength, low-maintenance materials.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High force, adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Vibro Hammer for Efficient Eccentric Foundation Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Construction
US$23,000.00
1 Piece(MOQ)
Heavy-Duty Piling Hammer for Fast and Efficient Excavation
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy Duty Vibro Hammer for Powerful Electric Pile Driving Solutions
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Electric Vibro Pile Hammer for Efficient Heavy-Duty Construction Tasks
US$62,900.00-83,900.00
1 Piece(MOQ)
Versatile Vibro Hammer for Efficient Low Clearance Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Sheet Piling Efficiency
US$16,500.00-30,000.00
1 sets(MOQ)
Heavy-Duty Electric Vibro Hammer for Reliable Foundation Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Excavator Vibro Hammer Attachment for Fast Pile Driving Tasks
US$14,000.00-14,500.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Hammer for 30 Ton Excavators
US$2,500.00
1 Piece(MOQ)
Heavy-Duty Electric Vibro Hammer for Precision Foundation Construction
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Pile Hammer for Construction Projects
US$20,000.00-22,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Vibro Hammer for Reliable Foundation Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Quick Piling Solutions
US$20,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Hammer for Reliable Bridge Foundation Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Vibratory Pile Hammer for 30 Ton Excavators
US$23,300.00
1 Piece(MOQ)
Powerful Vibro Hammer Attachment for Excavators and Construction
US$100,000.00-10,000,000.00
1 Set(MOQ)

















