Powered by Made-in-China.com
Industrial Heavy-Duty Pile Driver with High Vibration Frequency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Enables precise pile positioning from any angle for enhanced efficiency.
Dual Clamping System: Side and bottom clamps secure piles without needing extra equipment.
Low Clearance Capability: Designed for piling in minimal vertical clearance areas like tunnels.
Versatile Pile Compatibility: Handles steel sheets, H-beams, and pipe piles with quick changeovers.
Self-Sufficient Operation: Performs clamping, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Quality assured with durable frame and high-strength materials.
Global 24/7 Support: Technical assistance and spare parts supply available around the clock.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
15-35 days ex-works. Logistics optimized for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color & logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 certified. Durable frame and high-strength materials ensure low maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. Adjustable frequency & high force efficiently handle compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty 90-Ton Pile Driver Zyc100b for Industrial Applications
US$130,000.00
1 Set(MOQ)
Heavy-Duty High-Frequency Pile Driver for Urban Construction Needs
US$12,000.00-12,500.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Dual Clamping System
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Dual Clamping Pile Driver Tool with 2300 Rpm
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Adjustable Arm Extension
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Counterweight for Enhanced Stability
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Fv-330 Impact Driver with Advanced Vibration Technology
US$100,000.00-1,000,000.00
1 Set(MOQ)
High-Efficiency Fv-280 Hydraulic Pile Driver for Heavy-Duty Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
High Striking Force and High Working Efficiency Handheld Heavy Duty Post Driver
US$1,888.00
1 Set(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with High Vibration Speed
US$13,500.00-14,000.00
1 Piece(MOQ)
High-Efficiency Hydraulic Pile Driver with Photovoltaic Cement Vibration Hammer New Condition Motor as Core Component
US$1,000.00-3,000.00
1 sets(MOQ)
Vibratory Pile Driver with High Frequency Vibratory Hammer
US$29,800.00
1 Set(MOQ)
Heavy-Duty Hydraulic Sheet Pile Driver with Powerful Vibro Hammer
US$14,000.00-14,500.00
1 Piece(MOQ)
Heavy-Duty High Frequency Pile Driver for 20-Ton Excavators
US$15,600.00-15,980.00
1 sets(MOQ)
Heavy-Duty Hydraulic Pile Driver with Advanced Vibro Hammer Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
High Frequency Vibration Hydraulic Driver New Construction Site Piling Equipment Core Motor Pile Driver Construction Site
US$1,000.00-3,000.00
1 sets(MOQ)
High-Efficiency Diesel Hammer Pile Driver for Heavy-Duty Construction Needs
US$36,000.00-66,000.00
1 Piece(MOQ)
Industrial Grade Solar Pile Driver with Duty Mast for Scale Solar Farms
US$19,000.00-20,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with Efficient Hydraulic Clamp System
US$12,600.00-19,500.00
1 Piece(MOQ)



















