Powered by Made-in-China.com
Powerful Vibro Hammer for Quick and Effective Piling Solutions
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Rotation: Enables precise pile positioning from any angle for maximum efficiency.
Dual Clamping System: Side and bottom clamps secure piles during driving and extraction without extra equipment.
Low Clearance Capability: Unique side grip design allows operation in minimal headroom areas like tunnels.
Versatile Pile Compatibility: Handles steel sheets, H-beams, and pipes with quick-change clamp seats.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Ensures high-strength materials and minimal maintenance for quality assurance.
Customizable Configuration: Color, logo, and design customization available upon request.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Logistics available for SE Asia, India, Russia.
Q:Can the machine be customized?
A:
Yes. Customization includes color, logo, and tailored designs for specific projects.
Q:How is the machine's quality assured?
A:
ISO 9001:2015 compliance with high-strength materials and minimal maintenance.
Q:Is it suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency make it adaptable to compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Powerful Hydraulic Vibro Hammer for Efficient Piling Solutions
US$12,000.00-12,500.00
1 Piece(MOQ)
Effective Electric Pile Hammer for Foundation Piling and Driving
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy Duty Vibro Hammer for Powerful Electric Pile Driving Solutions
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Powerful Vibro Hammer: 3200 Rpm for Effective Pile Driving
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Electric Vibro Hammer for Reliable Foundation Improvement Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Hydraulic Vibro Hammer for Fast Sheet Piling Solutions
US$14,500.00-15,000.00
1 Piece(MOQ)
Reliable Vibro-Hammer Tools for Quick and Effective Piling
US$22,000.00-23,000.00
1 Piece(MOQ)
Powerful Excavator Mounted Vibro Hammer for Efficient Piling
US$20,000.00
1 Piece(MOQ)
Eccentric Moment Vibro Hammer for Effective Piling Machinery Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Efficient Hydraulic Vibro Hammer for Quick Piling Solutions
US$11,500.00-13,000.00
1 Piece(MOQ)
Excavator Pile Driving Machine - Vibro Hammer for Road and Bridge Construction
US$10,000.00
1 Piece(MOQ)
Dynamic Electric Vibro Hammer for Effective Pile Installation Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
Compact Vibro Hammer for Efficient Narrow Space Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
High Quality Hydraulic Borehole Piling Rig New Solar Pile Driver with Hammer and Engine for Solar Projects Mine Drilling Rig
US$9,400.00-10,000.00
1 Piece(MOQ)
Zss500 Hydraulic Vibro Pile Drive Hammer for Site Pile Zosin Cost-Effective
US$15,000.00-22,000.00
1 Piece(MOQ)
Advanced High-Frequency Vibro Hammer for Efficient Piling Solutions
US$100,000.00-1,000,000.00
1 Set(MOQ)
Vh250 Vibro Hammer for Casing and Sheet Piling
US$200.00-5,000.00
1 Set(MOQ)
Piling Driver Hydraulic Vibratory Hammer for Fast Pile Sinking and Pile Pulling
US$100,000.00-1,000,000.00
1 Piece(MOQ)



















