Powered by Made-in-China.com
Robust Construction Driver: Engineered for Heavy-Duty Vibration Management
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps grip piles for driving and extraction without extra equipment.
360-Degree Rotation: Full rotation allows precise positioning from any angle without repositioning the excavator.
Low Clearance Capability: Side grip design enables operations in limited headroom like tunnels and under bridges.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and circular pipes with quick clamp changes.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Manufactured with high-strength materials to minimize maintenance and ensure quality.
Custom Configurations: Available for color, logo, and specific design needs to match fleet requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
15-35 days ex-works. Logistics optimized for Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo.
Q:What ensures the machine's quality and durability?
A:
ISO 9001:2015 certified. High-strength materials minimize maintenance.
Q:Is the machine suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
T-Works Heavy Duty Electric Hydraulic Static Pile Driver for Construction Foundation
US$130,000.00
1 Set(MOQ)
T-Works Hydraulic Static Pile Driver Heavy Duty Concrete Equipment for Construction
US$130,000.00
1 Set(MOQ)
Heavy-Duty Deep Foundation Driver for Excavators and Construction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver Zyc120b-B for Construction Projects
US$130,000.00
1 Set(MOQ)
Powerful Hydraulic Pile Driver for Heavy-Duty Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B Pile Driver for Reliable Construction Projects
US$130,000.00
1 Set(MOQ)
Heavy-Duty Excavator-Mounted Pile Driver for Road, Bridge & Port Construction
US$11,000.00-20,000.00
1 piece(MOQ)
Robust Heavy-Duty Hammer Pile Driver for Construction Projects
US$10,000.00-12,000.00
1 Piece(MOQ)
Heavy-Duty 360° Hydraulic Pile Driver for Efficient Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Diesel Hammer Pile Driver for Robust Construction Applications
US$36,000.00-66,000.00
1 Piece(MOQ)
Heavy-Duty S700 Excavator Vibro Pile Driver for Construction Efficiency
US$38,000.00-41,000.00
1 Piece(MOQ)
Heavy-Duty Excavator Vibro Pile Driver for Construction Projects
US$7,000.00-9,000.00
1 pieces(MOQ)
Heavy-Duty Excavator Vibro Pile Driver with Robust Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
10m Heavy Duty Photovoltaic Pile Driver for Large Solar Farm Construction
US$26,999.00-27,590.00
1 Set(MOQ)
Heavy-Duty Pile Driver Attachment for Excavators and Construction
US$21,500.00-24,150.00
1 Set(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
Juxiang Heavy-Duty Excavator Vibro Pile Driver for Efficient Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Powermax Diesel Hammer Pile Driver for Heavy-Duty Construction Projects
US$36,000.00-66,000.00
1 Piece(MOQ)
Heavy-Duty Jzl90 Pile Driver for Fast Construction Success
US$165,000.00-170,000.00
1 Piece(MOQ)



















