SourcingAI

second hand mould

I have found results from20000+products and5000+suppliers aboutsecond hand mould

Commonly used:
US$
Customization Available
Sample Available
Manufacturer First
Product attributes:
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Plastic Material: PE
Application: Household Appliances
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Standard: DME
Customized: Customized
Process Combination Type: Progressive Die
Certification: ISO
Surface Finish Process: Electroplating
Surface Finish Process: Mirror Polishing
Surface Finish Process: Heat Treatment
Mould Cavity: Multi Cavity
Plastic Material: Acrylic
Plastic Material: ABS
Plastic Material: POM
Plastic Material: HDPE
Plastic Material: PC
Plastic Material: PA66+GF
Plastic Material: PVC
Plastic Material: PET
Application: Commodity
Application: Car
Application: Furniture
Application: Electronic
Application: Home Use
Application: Hardware
Runner: Cold Runner
Design Software: AutoCAD
Design Software: Pro-E
Installation: Mobile
Installation: Semi Fixed
Standard: MISUMI
Standard: HASCO
Standard: PUNCH
Customized: Non-Customized
Process Combination Type: Single-Process Mode
Process Combination Type: Compound Die
Certification: TS16949
Certification: CE
Certification: FDA

Sourcing guidance for Second Hand Mould

How to evaluate the technical condition of a second-hand mould?

When sourcing second-hand moulds, the most critical factor is the remaining service life. You must request the shot count records to determine how many cycles the mould has already completed. Inspect the cavity and core surfaces for signs of wear, corrosion, or previous repairs. Ensure the cooling system is pressure-tested to check for blockages or leaks, and verify that the ejection mechanism operates smoothly without binding. For high-precision needs, ask for a recent trial sample (T1/T2) produced by the mould to check for flash, warping, or dimensional deviations.

What are the key compatibility requirements for second-hand injection moulds?

Technical compatibility is essential to ensure the mould fits your existing machinery. You must verify the mould dimensions (Length x Width x Height) against your machine's tie-bar spacing and maximum daylight. Check the clamping force requirement to ensure your machine can handle the projected area of the part. Additionally, confirm the locating ring diameter, sprue bushing radius, and ejector rod pattern (e.g., hydraulic or mechanical) to avoid costly modifications after delivery.

Which material and construction standards should be prioritized?

Prioritize moulds constructed with high-grade tool steel such as P20, H13, or S136, as these offer better durability and can be refurbished more effectively. Ensure the mould base follows international standards like LKM, DME, or HASCO, which makes sourcing replacement components (like leader pins or bushings) much easier in your local market. For multi-cavity moulds, check if it is a cold runner or hot runner system; if it is a hot runner, identify the brand (e.g., Yudo, Mold-Masters) to ensure you can get technical support.

How to ensure the economic feasibility of purchasing used moulds?

The purchase price is only one part of the Total Cost of Ownership (TCO). You must factor in the refurbishment costs, shipping weight (moulds are heavy), and import duties. A second-hand mould is economically feasible if the total cost is at least 40-60% lower than a new mould, and if the part design is stable. If the product requires frequent design updates, the cost of modifying a hardened steel second-hand mould may exceed the cost of building a new aluminum or soft steel prototype mould.

Cross-Border Procurement Risks and Strategies for Second-Hand Moulds

What are the common risks in cross-border second-hand mould purchasing?

The primary risk is asymmetric information regarding the mould's actual condition. To mitigate this, always use Made-in-China.com's verified supplier system and request a video of a dry cycle run or a live production trial. Another risk is damage during transit due to improper rust prevention. Ensure the supplier applies heavy-duty anti-rust oil to the cavities and uses vacuum sealing before placing the mould in a reinforced fumigated wooden crate.

How should I negotiate with suppliers for used industrial equipment?

Negotiation should focus on transparency and technical documentation. Request the original 2D/3D CAD drawings of the mould; without these, future repairs will be extremely difficult and expensive. Negotiate a retention payment (e.g., 10-20%) to be released only after the mould has been received and passed a dry-run inspection at your facility. Ask the supplier to include a spare parts kit (O-rings, springs, ejector pins) as part of the deal.

What are the shipping and customs considerations for heavy moulds?

Moulds are high-density cargo, so Sea Freight is the only cost-effective method. Ensure the HS Code (typically 848071 for plastic injection moulds) is correctly declared to avoid customs delays. Be aware that some countries have strict regulations on importing 'used' industrial goods; check if a Pre-Shipment Inspection (PSI) or a certificate of origin is required by your local customs authority to prove the equipment is not 'industrial waste'.

How to ensure transaction security when dealing with international suppliers?

Always conduct transactions through secure payment channels provided by reputable platforms like Made-in-China.com. Avoid direct wire transfers to unknown accounts. Utilize third-party inspection services (such as SGS or Intertek) to perform an on-site audit of the mould before the final balance is paid. This ensures the 'as-seen' quality matches the 'as-delivered' reality.

Related queries