SourcingAI
Try for free
Powered by Made-in-China.com
Column Mould Formwork for Accurate Construction Results
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Load Capacity: Supports 60 KN per square meter for safe and durable construction.
Fast Construction Speed: Enables rapid installation with a construction period of 3-5 days per storey.
Premium Material Quality: Manufactured from durable Aluminium alloy 6061-T6 for long-term use.
Global Certification: Certified with ISO and CE standards, supported by SGS test reports.
Cost-Effective Design: Smooth finish eliminates plastering needs; scrap value is 50% of new panels.
Easy Installation: Workers can easily learn to install and dismantle after short training.
Versatile Application: Ideal for concrete moulds, wall columns, stairs, and monolithic casting.
Available After-Sales: Comprehensive after-sales service is available for customer support.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.95h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the load capacity of the formwork?
A:
The formwork has a high load capacity of 60 KN per square meter, ensuring stability and uniform load distribution.
Q:How long does it take to construct one storey?
A:
The construction period is fast, typically requiring only 3-5 days per storey.
Q:What material is used for the formwork?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6, ensuring firmness and durability.
Q:Is after-sales service provided?
A:
Yes, after-sales service is available to support customers with any issues or questions.
Q:What certifications does the product have?
A:
The product is certified with ISO and CE standards and is supported by SGS test reports.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Column Mould Formwork for Accurate and Precise Construction
Made-in-China.com
Column Mould Formwork for Precise and Accurate Construction
Made-in-China.com
Aluminum Column Mould Formwork for Accurate Construction
Made-in-China.com