SourcingAI
Try for free
Powered by Made-in-China.com
Column Mould Formwork for Precise Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Cycle: Construction period is 3-5 days per storey.
No Plastering Required: Smooth surface after removal eliminates plastering costs.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
Crane-Free Assembly: Does not require crane for shifting, optimizing crane usage.
Durable Aluminum Material: Made of 6061-T6 aluminum alloy for firmness and longevity.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can learn installation and dismantling after short training.
One-Year Warranty: Includes 1-year warranty coverage for the product.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.74h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
It is made of 6061-T6 aluminum alloy.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Column Mould Formwork for Precise and Accurate Construction
Made-in-China.com
Column Mould Formwork for Accurate and Precise Construction
Made-in-China.com
Column Mould Formwork for Precise Construction with Good Price
Made-in-China.com
Aluminum Column Mould Formwork for Accurate Construction
Made-in-China.com