SourcingAI
Try for free
Powered by Made-in-China.com
H20 Formwork for Efficient Construction Works
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Cycle: Construction period is 3-5 days per storey for efficient project delivery.
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, saving time.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Durable Material: Made from Aluminium alloy 6061-T6 which is firm and prevents bursting.
Comprehensive Warranty: Includes a 1-year warranty coverage for the product.
ISO and CE Certified: Product meets international safety and quality standards with ISO and CE certification.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable H20 Timber Beam Formwork for Efficient Concrete Construction
Made-in-China.com
H20 Formwork for Efficient Construction Periods

H20 Formwork for Efficient Construction Periods

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Flexible Frame Formwork for Quick and Efficient Concrete Work
Made-in-China.com
Premium Modular Formwork for Fast and Efficient Construction
Made-in-China.com