Powered by Made-in-China.com

H20 Formwork for Efficient Construction Works
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Rapid Construction Cycle: Construction period is 3-5 days per storey for efficient project delivery.
No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, saving time.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Durable Material: Made from Aluminium alloy 6061-T6 which is firm and prevents bursting.
Comprehensive Warranty: Includes a 1-year warranty coverage for the product.
ISO and CE Certified: Product meets international safety and quality standards with ISO and CE certification.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Lianggong Manufacture Innovative H20 Flex Formwork System for Efficient Construction
US$55.00-100.00
500 Square Meters(MOQ)
Durable H20 Timber Beam Formwork for Efficient Concrete Construction
US$140.00-250.00
1,000 Square Meters(MOQ)
Lianggong Heavy Duty High Pressure Resistance H20 Timber Beam Formwork for Efficient Concrete Wall and Slab Construction
US$66.00-88.00
100 Square Meters(MOQ)
Energy Efficient Worksite Use Green Concrete Formwork System for Rapid Construction Work
US$100.00-120.00
500 Square Meters(MOQ)
Efficient Convenient Popular Durable Circular H20 Timber Beam Formwork for Construction
US$6.00-10.00
1,000 Meters(MOQ)
Doka Supplier Lianggong Manufacture H20 Formwork System for Efficient Floor Construction
US$55.00-100.00
500 Square Meters(MOQ)
H20 Formwork for Efficient Construction Periods
US$50.00-100.00
1 Square Meter(MOQ)
Lianggong Manufacture Versatile H20 Modular Formwork for Efficient Construction
US$55.00-100.00
500 Square Meters(MOQ)
Efficient H20 Timber Formwork with Quick Assembly for Construction Needs
US$68.00-88.00
300 Square Meters(MOQ)
Time-Saving & Durable: H20 Beam Wall Formwork for Efficient Construction
US$90.00-100.00
200 Square Meters(MOQ)
Wall Formwork for Efficient High Rise Building Construction Works
US$50.00-100.00
1 Square Meter(MOQ)
Flexible Frame Formwork for Quick and Efficient Concrete Work
US$89.00-139.00
100 Square Meters(MOQ)
Efficient Single-Side Bracket Formwork for Robust Concrete Construction Projects
US$60.00-70.00
100 Meters(MOQ)
Factory H20 Wooden Pine/Spruce Timber Beans for Formwork for Concrete Slab Construction
US$7.00-9.00
300 Meters(MOQ)
Concrete Formwork Aluminum Frame Slab Formwork for Efficient Flooring Beam-Less Building Construction
US$120.00-150.00
100 Square Meters(MOQ)
Linyi Waterproof Wooden Doka H20 Timber Beam for Formwork Construction
US$5.45-5.91
500 Meters(MOQ)
Premium Modular Formwork for Fast and Efficient Construction
US$99.00-119.00
100 Square Meters(MOQ)



















