Powered by Made-in-China.com

Wall Formwork for High Rise Building Projects
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Period: 3-5 days per storey with efficient installation.
No Plastering Required: Smooth finish eliminates plastering costs after removal.
Crane-Free Assembly: Does not require crane for shifting, saving time and cost.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
Durable Material: Made from firm Aluminium alloy 6061-T6 to prevent bursting.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can learn to install and dismantle after short training.
ISO and CE Certified: Meets international safety and quality standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.44h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for one storey?
A:
The construction period is 3-5 days per storey.
Q:Is a crane required for assembly?
A:
No, the system does not require a crane for shifting and assembly.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
It is made of Aluminium alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Lianggong Reusable Heavy Duty Steel Column Wall Slab and Beam Formwork for High-Rise Concrete Construction
US$65.00-75.00
100 Square Meters(MOQ)
Industrial Easy Assemble High Quality Green Slab Formwork for High-Rise Building
US$1.99-199.00
5,000 Pieces(MOQ)
Durable Precast Plywood Concrete Frame Formwork Aluminum Formwork for Wall Column High-Rise Building
US$110.00-210.00
300 Square Meters(MOQ)
High-Load Aluminum Frame Formwork for Massive Concrete Retaining Wall Project Building Material
US$120.00-160.00
50 Square Meters(MOQ)
High Quality Panel Aluminum Formwork for High Rise Buildings
US$50.00-100.00
1 Square Meter(MOQ)
China Steel Tunnel Formwork for Fast Wall and Slab Construction Projects
US$1,500.00-1,600.00
100 Tons(MOQ)
Lianggong Quick-Assembly Steel Frame Formwork for High Pressure Projects
US$70.00-75.00
100 Square Meters(MOQ)
China Factory High-Performance Timber Beam Formwork for Building Projects
US$95.00-100.00
100 Square Meters(MOQ)
Lianggong Premium Efficient Cantilever Cilmbing Wall Formwork for High Building Consteuctuon
US$3,888.00-3,999.00
5 Sets(MOQ)
Wall Formwork for Efficient High Rise Building Construction Works
US$50.00-100.00
1 Square Meter(MOQ)
Lightweight Reusable Aluminum Formwork for High Rise Building Concrete Construction
US$5.00-50.00
180 Square Meters(MOQ)
Greenformwork Early Stripping Steel Frame Plywood Formwork Fast Turnover OEM Custom Slab Wall Panel for High-Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
High-Strength Aluminum Building Formwork for Fast Construction Projects
US$40.00
100 Square Meters(MOQ)
Formwork Aluminium for High-Rise Building
US$750.00-800.00
400 Square Meters(MOQ)
Concrete High Strength Steel Formwork, Custom Size Steel Mould for Commercial Building Project
US$28.00-100.00
1 Piece(MOQ)
Steel Adjustable Cantilever Climbing Formwork for High Rise Wall Bridge Dam Hydropower Station Construction
US$220.00-380.00
200 Square Meters(MOQ)



















