Powered by Made-in-China.com
Steam Turbine Coal Electric Plant
Shandong, ChinaRunh Power Corp., Ltd.
Steam Turbine Coal Electric Plant
US$1,000,000.00
1 Piece
Sample price:US$1000000.00/piece.Request sample
Product profile
Voltage
380VGenerating Methods
Thermal Power GenerationPhase
Three PhasePower
0.5MW - 100MWFuel
Coal, Gas, Oil, Biaboss etcCustomerized
AvailableWarranty Period
One YearTransport Package
Standard PackingSpecification
1MW POWERTrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
100/ YearKey features
Comprehensive EPC Services: Full turnkey service including design, construction, installation, and spare parts supply.
Flexible Power Range: Customizable power output from 0.5MW to 100MW to suit various project scales.
Multi-Fuel Compatibility: Supports diverse fuels including coal, gas, oil, biomass, and agricultural waste.
Experienced Engineering Team: 50 professional engineers with 28 years of experience in international power projects.
Competitive Delivery Time: Guaranteed schedule through prioritized manufacturing and local branch support.
Global After-Sales Support: One-to-one service, periodic visits, and global maintenance team for risk reduction.
Cost-Effective Equipment: Cooperative OEMs provide advanced technology at competitive prices with guaranteed quality.
Second-Hand Equipment Options: Renovated units available with shorter construction periods and same warranty as new.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤18h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the warranty period for the equipment?
A:
The warranty period is one year for both new and second-hand equipment.
Q:What fuels can this power plant use?
A:
It supports multiple fuels including coal, gas, oil, biomass (wood chip, bagasse, etc.), and agricultural waste.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:Does the company offer customization services?
A:
Yes, we offer OEM, ODM, and full customization options from samples or designs.
Q:What are the payment terms?
A:
We accept LC (Letter of Credit) and T/T (Telegraphic Transfer).
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
Condensing Steam Steam Turbine Wood Rice Husk Coal Power Plant
US$1,000,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)
Steam Turbine Power Plants 10MW 20 MW 30 MW 50MW 100MW
US$1,000,000.00
1 Piece(MOQ)
Steam Turbine Generator Set Power Plant
Negotiable
1 Piece(MOQ)
1MW Gas Piston Power Plant Installation
US$99,999.00
1 Set(MOQ)
Horizontal Tubular/ Water Turbine/ Hydro Turbine/Power Plant
US$99,999.00
1 Piece(MOQ)
500kw Bio CNG Plant
US$99,999,999.00
1 Set(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
Bangladesh Coal-Fired Power Plant EPC Contractor
US$1,000,000.00
1 Piece(MOQ)
40MW Used Gas Turbine for Data Center Fast Track
US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Reference: 51MW Lignite Coal-Firing Power Plant in Turkey
Negotiable
1 Piece(MOQ)
Competitive Price Agricultural Waste Coal-Fired Steel Structure Power Plant
US$1,000,000.00
1 Piece(MOQ)
100MW- 300MW Used Gas Turbine
US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Wheat Straw Biomass Generator Thermal Electricity Generation System Power Plant
US$1,000,000.00
1 Piece(MOQ)
Thermal Power Plant Equipment Supplier
Negotiable
1 Piece(MOQ)
Horizontal Small Francis Turbine / Water Turbine Generator Unit
Negotiable
1 Set(MOQ)
Chinese Contractor of Thermal Power Plant Project
US$1,000,000.00
1 Piece(MOQ)
China EPC Constractor for High Efficiency and Low Power Consumption Thermal Power Plant
US$1,000,000.00
1 Piece(MOQ)
High-Precision CNC Machined Gas Turbine Wheel Components for Generators
US$50.00
10 Pieces(MOQ)



















