SourcingAI
Try for free
Powered by Made-in-China.com
Boiler Tube Seamless Alloy& Carbon Stee Pipe Asm A106b/ API5l/ API5CT / ASME 36.10
US$400.00-760.00
5 Tons

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

Pipes

Type

Seamless

Technique

Hot Rolled

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Trade Term

Fob CFR CIF

Delivery Time

15-30days

Transportation

by Ocean

Payment

LC Tt

Transport Package

in Bundles, or in Loose

Specification

Chemical Pipe, Piling, Oil, Tailing Pipe, etc. 20

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Customizable Specifications: Supports custom sizes, thicknesses, and surface treatments including varnishing, galvanized, and polishing.
Versatile Applications: Suitable for pipeline transport, boiler pipes, hydraulic systems, oil/gas drilling, and construction.
High Performance: Features high temperature, high pressure, and corrosion resistance for demanding industrial environments.
Flexible Trade Terms: Accepts FOB, CFR, CIF, EXW, LC, T/T, D/P, Western Union, and MoneyGram payments.
Value-Added Services: Provides in-house painting, coating, pipe cutting, welding, and mechanical fabrication upon request.
Quality Assurance: Third-party inspections (e.g., TUV) welcomed; goods released with MTC and stamped by TPI.
Fast Delivery Options: Delivery takes 5-10 days for stock items or 15-20 days for non-stock items based on quantity.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like