Powered by Made-in-China.com
Advanced Dual Clamping Vibro Hammer for Efficient Foundation Piling
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps securely grip piles during driving and extraction for stability.
360-Degree Rotation: Full continuous rotation allows precise pile positioning from any angle.
Low Clearance Capability: Unique side grip design enables operations in minimal vertical headroom areas.
Versatile Pile Compatibility: Drives and extracts steel sheets, H-beams, and pipes with quick changeovers.
ISO 9001:2015 Certified: Compliance ensures high-strength materials and low maintenance quality.
Global 24/7 Support: Engineers available for technical help and parts supply around the clock.
Customizable Design: Color, logo, and specifications can be tailored to specific project needs.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:Delivery lead time to our region?
A:
Lead time is 15-35 days. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized for our fleet?
A:
Yes. Includes color and logo.
Q:How is the machine's quality assured?
A:
ISO 9001:2015 compliance. High-strength materials, low maintenance.
Q:Suitable for hard soil conditions?
A:
Yes, with high force and adjustable frequency.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Powerful Vibro Hammer Tool for Efficient Foundation Work
US$100,000.00-1,000,000.00
1 Set(MOQ)
Efficient Electric Vibro Hammer for Soft Soil Foundation Projects
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Vibro Hammer for Efficient Hydraulic Pile Driving Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Dual-Clamping Vibro Hammer for Efficient Pile Driving
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient Electric Vibro Hammer for Advanced Foundation Improvement
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Hydraulic Vibro Hammer for Efficient Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Advanced Korean Vibro Hammer for Efficient Solar Foundation Installation
US$22,000.00-23,000.00
1 Piece(MOQ)
Advanced Electric Vibro Pile Hammer for Precise Foundation Work
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Efficient Sheet Piling
US$21,000.00-22,500.00
1 sets(MOQ)
Robust Electric Vibro Hammer for Efficient Foundation Construction Tasks
US$62,900.00-83,900.00
1 Piece(MOQ)
Durable Excavator Hydraulic Vibro Hammer for Efficient Piling
US$2,000.00-4,500.00
1 Piece(MOQ)
Advanced Vibro Hammer for Efficient Piling and Extraction
US$22,000.00-23,000.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Foundation Work S350 S500
US$22,000.00-23,000.00
1 Piece(MOQ)
Advanced Solar-Powered Hammer for Fast and Efficient Pile Driving
US$9,800.00-25,000.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Quick Piling Solutions
US$20,000.00
1 Piece(MOQ)
Advanced Hydraulic Vibro Hammer for Modern Infrastructure and Building Foundations
US$11,040.00
1 Piece(MOQ)



















