Powered by Made-in-China.com
Powerful Vibro Hammer Tool for Efficient Foundation Work
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-350SPressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
134.4kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
3200 RpmCentrifugal Force
505 kNEccentric Moment
7.4 KgmOperation Pressure
32 MPaWork Flow
240~320 L/MinMax.Pile Length
12mSuitable Excavator
36~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
High Vibration Force: Delivers 505kN centrifugal force for efficient pile driving in compacted soils.
Solar Farm Optimization: Tailored design specifically for photovoltaic industry and solar farm piling.
Compact Lightweight Design: Allows flexible operation in tight spaces while maintaining powerful performance.
Global Component Quality: Equipped with renowned motors and German bearings for superior reliability.
Cost-Effective Operation: Optimized efficiency reduces machinery investment and daily operational costs.
Proven Field Performance: Validated in diverse projects ensuring stable piling in varying soil conditions.
ISO 9001:2015 Certified: Manufacturing process meets international quality standards for durability.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure durability with minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils effectively.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Powerful Electric Pile Hammer for Efficient Vibratory Foundation Driving
US$62,900.00-83,900.00
1 Piece(MOQ)
Efficient Hydraulic Vibro Hammer for Reliable Foundation Work
US$38,000.00-41,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Fast Foundation Piling Solutions
US$100,000.00-10,000,000.00
1 Set(MOQ)
Powerful Vibro Hammer Tool for Durable Foundation Construction
US$23,000.00-24,000.00
1 Piece(MOQ)
Efficient Foundation Tool 360 Degree Vibro Hammer for Soil Compaction
US$100,000.00-1,000,000.00
1 Set(MOQ)
Compact Vibro Hammer for Tight Space Foundation Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Foundation Work S350 S500
US$22,000.00-23,000.00
1 Piece(MOQ)
Vibro Pile Hammer for Ground Foundation Work
US$11,500.00-12,800.00
1 Set(MOQ)
Brand New High-Performance Box Type Excavator Hammer for Foundation Work
US$780.00-800.00
1 Piece(MOQ)
Advanced Dual Clamping Vibro Hammer for Efficient Foundation Work
US$100,000.00-10,000,000.00
1 Set(MOQ)
Premium Excavator Vibro Pile Hammer for Efficient Foundation Work
US$22,000.00-23,000.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Efficient Sheet Piling
US$21,000.00-22,500.00
1 sets(MOQ)
Powerful Electric Vibro Hammer for Efficient Soft Soil Foundation
US$62,900.00-83,900.00
1 Piece(MOQ)
Manual Slide Hammer Driver Fence Post Drilling Machinery for Efficient Sampling Works
US$1,762.00
16 Pieces(MOQ)
Electric Vibro Hammer for Efficient Soft Soil Foundation Works
US$62,900.00-83,900.00
1 Piece(MOQ)
Premium Vibro Hammer for Efficient Pile Driving Solutions
US$20,000.00-22,000.00
1 Piece(MOQ)
Powerful Zosin Zss500 Vibro Hammer for 27-37 Ton Excavators
US$20,000.00-22,000.00
1 Piece(MOQ)
Hot Selling High Efficiency Fully Hydraulic System Vibro Hammer for Foundation Works
US$25,000.00-25,300.00
1 sets(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)



















