Powered by Made-in-China.com
Advanced Dual Clamping Vibro Hammer for Foundation Piling
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps securely hold piles, eliminating extra handling equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle for enhanced efficiency.
Low Clearance Capability: Side grip design allows operations in tight vertical spaces where top-drive hammers cannot.
Versatile Pile Compatibility: Replaceable clamp seat fits multiple pile types with quick changeovers.
Self-Sufficient Operation: Completes piling process independently without needing auxiliary cranes.
ISO 9001:2015 Certified: Compliance ensures high-strength materials and low maintenance requirements.
Custom Configurations: Tailored designs available for color, logo, and specific project requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
Lead time is 15-35 days ex-works. Logistics available for SE Asia, India, Russia.
Q:Can the machine be customized?
A:
Yes. Customization includes color and logo.
Q:How is the machine's quality assured?
A:
ISO 9001:2015 compliance. High-strength materials ensure low maintenance.
Q:Is it suitable for hard soils?
A:
Yes. High force and adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Vibro Hammer for Reliable Foundation Tool Performance
US$100,000.00-1,000,000.00
1 Set(MOQ)
Advanced Dual Clamping Vibro Hammer for Efficient Foundation Work
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient Electric Vibro Hammer for Advanced Foundation Improvement
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Dual Clamping Vibro Hammer for Superior Piling Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Dual Clamping Vibro Hammer for Advanced Foundation Piling Techniques
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Electric Vibro Pile Hammer for Precise Foundation Work
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Efficient Piling and Foundation Work S350 S500
US$22,000.00-23,000.00
1 Piece(MOQ)
Advanced 360-Degree Rotating Vibro Hammer for Piling Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
Heavy-Duty Electric Vibro Pile Piling Hammer for Deep Foundation Installation
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Juxiang S350 Vibro Piling Hammer for Construction Projects
US$22,000.00-23,000.00
1 Piece(MOQ)
Ray Vibratory Drivers Piling Hammer Hydraulic Vibro Hammer for Piling
US$18,300.00
1 Set(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
China Made Rt-150A 150kw Electric Vibro Pile Hammer for Overseas Foundation Contractors and Piling Companies
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Excavator Mounted Vibro Hammer for Efficient Piling
US$20,000.00
1 Piece(MOQ)
Heavy-Duty Vibro Hammer for Reliable Foundation Piling Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
High-Performance Zss500 Hydraulic Vibro Hammer for Piling Applications
US$10,000.00
1 Piece(MOQ)
Excavator Vibratory Concrete Sheet Pile Pipes Drivers Rotary Hydraulic Vibro Hammer for Piling
US$1,000.00-3,000.00
1 sets(MOQ)
Pile Hammer Excavator Vibro Hammer for Foundation Pile
US$25,000.00-25,300.00
1 sets(MOQ)



















