Powered by Made-in-China.com
Dual Clamping Foundation Tool: Heavy-Duty Pile Driver with Efficiency
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
AI-Powered supplier vetting
SummaryShanghai Yekun Construction Machinery Co., Ltd. is a technology-driven enterprise focused on vibratory pile driving and extraction equipment, with a strong emphasis on R&D and customization capabilities. The company lacks overseas service infrastructure and does not participate in offline trade shows. Financially, there is no explicit evidence of deficiencies, but specific financial figures are not disclosed. The supplier offers a range of design customizations but does not provide ODM or OEM services.
Supplier typeShanghai Yekun Construction Machinery Co., Ltd. is a technology-driven trade company in the manufacturing industry, specializing in vibratory pile driving and extraction equipment.
After-Sales capabilityThe supplier does not have overseas warehouses or showrooms, nor does it have overseas agents or branches, limiting its after-sales service capability abroad.
R&D capabilityThe company has R&D capabilities, having developed new products in the past year, and emphasizes innovation in its company description.
Customization capabilityThe supplier offers extensive customization capabilities, including full, minor, and flexible customizations.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Side Grip Pile Driver with Heavy-Duty Design and Superior Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Versatile Top Press and Clamp
US$300,000.00
1 Set(MOQ)
Heavy-Duty Zyc100b-B Pile Driver for Reliable Foundation Support
US$130,000.00
1 Set(MOQ)
Deep Foundation Driver with Heavy-Duty Precision for Excavator Use
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with 8t Lifting Power
US$300,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver with Counterweight for Enhanced Stability
US$370,000.00
1 Set(MOQ)
Heavy-Duty Piling Driver with Balanced Force for Deep Foundations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Dual Clamping System Hydraulic Side Grip Pile Driver for Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Sheet Pile Driver with Powerful Vibro Hammer
US$14,000.00-14,500.00
1 Piece(MOQ)
LG-3.5 Heavy-Duty Foundation Pile Driver – 3.5m Deep, 500mm Diameter for Secure Installations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Jzb60 Pile Driver for Efficient Ground Foundation Work
US$135,000.00-140,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver with Advanced Vibro Hammer Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
Heavy Duty Crawler Pile Driver for PV Panel Foundation
US$23,000.00-25,000.00
1 Piece(MOQ)
Heavy-Duty 6T Solar Farm Pile Driver for Deep Foundations
US$22,000.00-26,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Efficient Foundation Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with Efficient Hydraulic Clamp System
US$12,600.00-19,500.00
1 Piece(MOQ)
Heavy Duty 1 Year Warranty Hydraulic Pile Driver for 500-1600mm Drilling with ISO 9001: 2000
US$50,000.00-55,000.00
1 Set(MOQ)
SDLQ LG-5 Heavy-Duty PV Foundation small solar pile driver
US$22,000.00-26,000.00
1 Piece(MOQ)
High-Efficiency Diesel Hammer Pile Driver for Heavy-Duty Construction Needs
US$36,000.00-66,000.00
1 Piece(MOQ)



















