Powered by Made-in-China.com
Heavy-Duty Eccentric Moment Side Grip Pile Driver Tool
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-300Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
133.3kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
5.6 KgmCentrifugal Force
558 kNVibration Frequency
2300~3000 RpmSide Clamp Force
385kNBottom Clamp Force
490kNOperation Pressure
32 MPaWork Flow
220~280 L/MinWeight
3150 KgSuitable Excavator
25~32 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps secure piles during driving and extraction without extra equipment.
360-Degree Rotation: Full rotation enables precise pile positioning from any angle for maximum efficiency.
Low Clearance Capability: Designed for piling in minimal headroom areas like inside buildings and under bridges.
Versatile Pile Compatibility: Drives and extracts steel sheet, H-beams, and pipe piles using one base machine.
Self-Sufficient Operation: Completes piling independently without needing auxiliary cranes or equipment.
ISO 9001:2015 Certified: Adherence to international quality standards ensures high durability and minimal maintenance.
Customizable Configurations: Color scheme and logo can be customized to match your fleet and brand identity.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 adherence. High-strength materials ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Side Grip Pile Driver for Superior Construction Efficiency
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy Duty Side Grip Pile Driver for Construction Excellence
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Diesel Pile Driver for Reliable Side Piling Projects
US$120,000.00-278,697.00
1 Set(MOQ)
Heavy-Duty Sv-500 Side Grip Pile Driver for Strong Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Advanced Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy Duty Diesel Hydraulic Static Pile Driver Machine with Side Piling Mechanism
US$278,600.00-279,000.00
1 Set(MOQ)
Goodeng GPY228 Hydraulic Static Pile Driver Heavy-Duty Pile Driving Construction Equipment
US$150,000.00-250,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for Small Projects with 120t Force
US$261,000.00-270,000.00
1 Set(MOQ)
20 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$10,000.00-15,000.00
1 Piece(MOQ)
Durable SDLQ LQ180-18 Wheeled Pile Driver for Heavy Duty Use
US$30,000.00-36,000.00
1 Piece(MOQ)
Powerful Jzl90 Construction Pile Driver for Heavy-Duty Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
150s Side Grip Vibro Pile Driver Vibro Hammer for Cat315 Excavator
US$17,900.00
1 Piece(MOQ)
Jzb240 Walking Pile Driver for Heavy Duty Construction
US$333,300.00-333,333.00
1 Set(MOQ)
Hydraulic Side Grip Vibro Pile Driver Attachment for 30 Ton Excavator
US$25,000.00
1 Piece(MOQ)
LG Heavy Duty Post Driver OEM ODM Factory Supply Reliable Rugged Tool
US$1,500.00
1 Piece(MOQ)
Heavy-Duty Excavator Pile Driver Drill Bit Set for Tough Jobs
US$12,000.00-20,000.00
1 Piece(MOQ)
Heavy Duty Side Clamp Pile Driver for Excavator Foundation and Retaining Walls
US$23,300.00
1 Piece(MOQ)
Heavy Duty Steel Piliar Rammer Manual Fence Post/Pole/Pile Driver
US$5.00-10.00
100 Pieces(MOQ)
Robust 20 Ton Hydraulic Pile Driver for Heavy-Duty Applications
US$14,000.00-15,000.00
1 Piece(MOQ)



















