Powered by Made-in-China.com
Heavy-Duty Hydraulic Pile Driver for Efficient Construction Projects
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-800Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
231.0kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
997 kNEccentric Moment
14.5kgmOperation Pressure
32 MPaWork Flow
420 L/MinMax.Pile Length
27mSuitable Excavator
75~85tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors and German bearings delivering up to 1064 kN force.
High-Clamping Cast Steel Gripper: Strong jaws with 160-180 oil cylinders provide 650 kN max clamping force.
Intelligent Electronic Control: New-gen system optimizes performance, lifespan, precision, and safety.
Versatile Application Scenarios: Ideal for high-rise foundations, bridges, ports, marine, and urban infrastructure.
Global Technical Support: 24/7 assistance and spare parts supply available worldwide.
ISO 9001:2015 Certified: Ensures high quality standards and durable frame with minimal maintenance.
Customizable Configurations: Color and logo customization available upon request.
Fast Shipping Options: Standard models ship in 15-30 days; custom units in 30-45 days.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Delivery lead time to our region?
A:
Lead time 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to our fleet?
A:
Yes. Customization includes color and logo.
Q:How is quality and durability assured?
A:
ISO 9001:2015 standard. Durable frame ensures minimal maintenance.
Q:Suitable for hard soil conditions?
A:
Yes. High force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High - Performance Hydraulic Static Pile Driver with Counterweight Design Heavy Construction Machinery
US$120,000.00-278,000.00
1 Set(MOQ)
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Heavy-Duty Excavator Piling Driver for Precision Construction Tasks
US$100,000.00-1,000,000.00
1 Set(MOQ)
Powerful Jzb90 Pile Driver for Heavy-Duty Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Powerful 120t Hydraulic Pile Driver for Small Construction Projects
US$120,000.00-278,697.00
1 Set(MOQ)
High-Speed Hydraulic Piling Driver for Efficient Construction Projects
US$120,000.00
1 Set(MOQ)
Heavy-Duty Hydraulic Pile Driver for Reliable Construction Applications
US$100,000.00-1,000,000.00
1 Set(MOQ)
High Impact Pile Driver for Construction Projects
US$184,600.00
1 Piece(MOQ)
Heavy-Duty 360° Rotating Pile Driver for Bridge Construction Efficiency
US$100,000.00-1,000,000.00
1 Set(MOQ)
Robust Construction Driver: Engineered for Heavy-Duty Vibration Management
US$100,000.00-10,000,000.00
1 Set(MOQ)
Durable 360° Hydraulic Pile Driver for Heavy-Duty Excavators
US$22,000.00-23,000.00
1 Piece(MOQ)
Heavy-Duty Hydraulic Pile Driver for 20 Ton Excavators
US$14,000.00-14,500.00
1 Piece(MOQ)
Goodeng Hydraulic Static Pile Driver Heavy Pile Driving Equipment for Construction GPY158
US$140,000.00-150,000.00
1 Piece(MOQ)
Efficient Hydraulic Pile Driver for Construction Ground Stabilization
US$9,500.00-10,000.00
1 Piece(MOQ)
Heavy Duty Hydraulic Vibratory Pile Driver for Deep Foundation Construction Works
US$11,040.00
1 Piece(MOQ)
Heavy Duty Solar Pile Driver for Hard Soil Pile Driving
US$22,800.00-24,000.00
1 Piece(MOQ)
Jzl90 Pile Driver for Construction Projects
US$165,000.00-170,000.00
1 Piece(MOQ)
High-Performance Hydraulic Vibro Pile Driver for Efficient Construction
US$14,500.00-15,000.00
1 Piece(MOQ)
Powerful Goodeng GPY188 Hydraulic Static Pile Driver for Construction Projects
US$130,000.00-230,000.00
1 Piece(MOQ)
Goodeng GPY158 Hydraulic Static Pile Driver for Construction Projects
US$140,000.00-155,000.00
1 Piece(MOQ)



















