SourcingAI
Try for free
Powered by Made-in-China.com
Column Mould Formwork for Exact Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Cycle: 3-5 days construction period per storey with easy installation after short training.
High Load Capacity: Supports 60 KN load per square meter ensuring stability and preventing shifting.
No Plastering Required: Smooth surface finish after removal eliminates the need for additional plastering costs.
Crane-Free Assembly: Does not require crane for shifting and assembly, allowing crane to be used for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost, offering good economic return.
Versatile Application: Suitable for wall, stair, and monolithic casting construction with reliable results.
Durable Material: Made from Aluminium alloy 6061-T6 and steel, ensuring firmness and preventing bursting.
Certified Quality: Products are ISO and CE certified, guaranteeing safety and quality standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.44h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Column Mould Formwork for Accurate Construction Results
Made-in-China.com
Column Mould Formwork for Accurate and Precise Construction
Made-in-China.com
Column Mould Formwork for Precise Construction

Column Mould Formwork for Precise Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com